The world’s largest water conservancy project, with a total installed capacity of 22,500MW, has won FIDIC Centennial Award for Excellence in Major Civil Engineering Project. Energy China was contracted with more than 65% of the total workload.
It is the world’s second largest hydropower station, with a total installed capacity of 16,000MW.
With a total installed capacity of 300MW, it is Ethiopia’s largest hydropower station and has become the first overseas hydropower project winning the Luban Award, the most prestigious award in China’s construction field.
With a total installed capacity of 1,310MW and total investment of USD 5.3 billion, it is the largest cooperative project between China and Latin America and the largest overseas electric power project invested by Chinese enterprises to date. It helps Argentina supply 6.5% more power nationwide upon completion.
With a total installed capacity of 2,172MW, it is the largest hydropower project constructed in Africa.
With an installed capacity of 1,500MW, the Project adopts the world’s most advanced gas turbine technologies, featuring the highest combustion temperature, largest singleunit power output, and optimal thermal efficiency, and integrates comprehensive “zero liquid discharge” design, which makes it a world-class benchmark project with high-efficiency, eco-friendly power generation, energy conservation, and environmental sustainability. Gas turbine:Mitsubishi M701JAC
With a total installed capacity of 3.6GW, the Project is engineered with cutting-edge efficiency optimization and advanced environmental protection systems, incorporating H-class heavy-duty gas turbine combined cycle units designed for dual-fuel operation. Gas turbine: Siemens SGT6-9000HL
With a total installed capacity of 2×450MW, the Project is currently the largest power plant in Morocco. Gas turbine: Mitsubishi M701J
With a total installed capacity of 2×600MW, the Project sets the benchmark for 600MW-class combined cycle power generation units in China. It pioneers the high-level water collection mechanical draft cooling tower technology, achieving exceptional energy efficiency and environmental performance.Gas turbine: Mitsubishi M701J
With a total installed capacity of 1×650MW, the Project marks the first deployment of 9HA.01 gas turbine in China, and serves as a national demonstration project for energy conservation and emission reduction. Gas turbine: GE 9HA.01
With a total installed capacity of 650MW, the Project achieves a record-breaking thermal efficiency of 63.36% and a combined cycle output of 672.859MW, establishing itself as the most efficient operational gas-fired combined cycle unit in China. Gas turbine: GE 9HA.01
Total Installed Capacity: 372MW, Designed with high efficiency and environmental protection as the concept, it adopts E-class heavy-duty gas turbines in combined cycle unit, which is suitable for dual-fuel operation. Gas turbine: General Electric (GE) 9E.03
With a total installed capacity of 2×720MW, the Project is the world’s first GE 9HA.02 combined cycle gas power plant to achieve commercial operation.Gas turbine:GE 9HA.02
With the most complex and cutting-edge grid technology, it is the world’s first UHV multi-terminal flexible DC converter station.
As the world’s first 1000kV transmission project in operation, it won the Special Prize of National Science and Technology Progress Award and the National Quality Engineering Gold Award.
It is Brazil’s first and the world’s fourth ±800kV UHV DC transmission line.
It is the first energy capacity cooperation project signed between China and Egypt and Egypt’s largest power transmission line project.
It is an auxiliary project for power transmission of Belarus’s first nuclear power station, involving reconstruction of 75% grids in Belarus.
It is a 2×300MW class non-supplementary compressed air energy storage demonstration project, with the world’s multiple firsts in single-unit power, energy storage scale, and energy conversion efficiency (70%).
With an installed capacity of 99.8MW, it is currently the largest grid-side single battery energy storage plant in Europe and was put into commercial operation on June 30, 2021.
As the world’s first non-supplementary compressed air energy storage power plant, it has energy storage power and storage capacity of 300MW in Phase I.